MPPT Photovoltaic Panel Tester 800W 12-60V
Consegna al nostro magazzino: 10/12 giorni.
Secure Checkout
MPPT Photovoltaic Panel Tester 800W 12-60V
📐 5–800 W │ 12–60 V · 0–35 A │ One panel at a time — 🔧 Installation difficulty: 2/5 │ 🎯 Ideal for: module testing, troubleshooting production drops, off-grid systems, camper vans and balcony panels
Checking the actual power of a solar panel with MPPT measurement
A panel that produces less than expected may be faulty, dirty or shaded: to find out, you need to measure its actual power at the maximum power point (MPPT), not just the open-circuit voltage.
The photovoltaic panel tester automatically or manually detects the MPPT, open-circuit voltage and short-circuit current of a single panel up to 800 W, 60 V and 35 A. It uses no batteries: it is powered directly from the panel being tested.
Who chooses it
- Photovoltaic installers and maintenance technicians who test modules before installation or are looking for the panel causing a production drop.
- Anyone with an off-grid system, camper van or balcony kit who wants to know how much each panel really produces.
- It is not the right choice for measuring strings of multiple panels in series: the device exceeds its limits above 60 V.
Technical analysis and benefits of the MPPT tester
- 📈 Automatic and manual MPPT measurement: find the power the panel actually delivers and compare it with the nameplate rating.
- ⚡ Open-circuit voltage and short-circuit current: the two nameplate parameters (Voc and Isc) to identify damaged cells or faulty connections.
- ☀️ Powered by the panel: no batteries to replace; the device turns on with the module being tested.
- 🔌 Cables with photovoltaic connector and alligator clips: connect to both wired panels and bare terminals.
- 🛡️ Five protections: overvoltage, overtemperature, overcurrent, overpower and reverse polarity.
- 📏 165 × 80 × 30 mm, 470 g: fits in the included case along with the cables.
Technical specifications
| Manufacturer | Alpha Elettronica |
| Type | Photovoltaic panel tester |
| Measurements | MPPT (automatic and manual) · Open-circuit voltage · Short-circuit current |
| Supported power | 5–800 W |
| DC voltage | 12–60 V |
| DC current | 0–35 A |
| Measurement mode | Single photovoltaic panel |
| Display | Backlit LCD |
| Protections | Overvoltage · Overtemperature · Overcurrent · Overpower · Reverse polarity |
| Power supply | From the panel being tested |
| Dimensions / weight | 165 × 80 × 30 mm · 470 g |
| SKU / EAN | 98-841-08 / 8017443694668 |

⚠️ Technical warning — Simone's advice
The tester accepts up to 60 V and 800 W: always measure one panel at a time, because two modules in series easily exceed 60 V. Before connecting it, disconnect the panel from the regulator or inverter. For a meaningful comparison with the nameplate, measure in full sun with a clean module, bearing in mind that the nameplate rating refers to standard test conditions (1000 W/m² and 25 °C), which are rarely achieved on a roof.
Complete your project
- 🔗 MC4 male and female connector pair — to redo the panel connections.
- 🔗 Crimping pliers for photovoltaic connectors — to crimp the connectors onto the solar cables.
- 🔗 AC DC 600A clamp meter — to measure the current of strings without disconnecting them.
Frequently asked questions
How do you measure the power of a solar panel?
Disconnect the panel from the system, connect the tester to its cables and start the maximum power point (MPPT) search: the device charges the module until it finds the combination of voltage and current that delivers the most watts. The value should be read in full sun and compared with the nameplate, taking into account the irradiance.
Can you measure a string of panels in series?
No. The tester works on a single panel, up to 60 V and 800 W. In a string, the voltage is cumulative and quickly exceeds these limits. To check the current of an operating string, use a DC clamp meter; to find the faulty module, measure the panels one by one.
Package contents
📦 1× Photovoltaic panel tester · 1× Pair of red/black cables with photovoltaic connector · 1× Pair of red/black cables with alligator clips · 1× Case · 1× User manual
Warranty and safety
📜 2-year legal warranty (Italian Legislative Decree 170/2021) · ⚠️ Use the device only within the rated voltage and current limits and always disconnect the panel from other devices or loads before testing.
Shipping from Catania. Technical support for photovoltaic systems.
Changed your mind? Here's what to do
If you want to return your order, we're here to help. You have the right to withdraw from the purchase within 14 days of delivery, without having to provide any reason.
Right of withdrawal (within 14 days)
The deadline is 14 days from delivery. If the order includes multiple items delivered separately, the deadline starts from the delivery of the last item.
The 14 days are calculated in calendar days, including Saturdays, Sundays, and public holidays. If the last day falls on a Saturday, Sunday, or public holiday, the deadline is extended to the next working day.
How to exercise it: Initiate the request from the dedicated function in your account: https://account.oniroview.com → Orders section → "Manage" → "Request Return". The withdrawal is validly exercised at the moment you send the online request; it is not subject to our prior authorization.
- Return: You must send the products back within 14 days from the date you notified us of the withdrawal.
- Refund: We will refund you within 14 days of the withdrawal notification. We may withhold the refund until we have received the goods or proof of their shipment, whichever occurs first.
- Full withdrawal (you return all products in the order): 100% refund of the price plus standard outbound shipping costs. If you chose a more expensive delivery than the standard one at the time of the order, any supplement is not refundable.
- Partial withdrawal (you return only some products): refund of the price of only the returned products; outbound shipping costs are not refunded. If the order benefited from free shipping due to reaching a threshold and the partial return causes the value to fall below that threshold, the corresponding shipping cost will be calculated and deducted from the refund.
- Return costs: The direct costs of return are borne by the customer.
- Diminution in value: You are only responsible for any diminution in the value of the goods resulting from handling other than what is necessary to establish their nature, characteristics, and functioning. In such a case, we will deduct from the refund an amount corresponding to the ascertained lost value.
The refund will be made using the same payment method used for the purchase.
Exclusions from the right of withdrawal
Pursuant to Article 59 of the Consumer Code, withdrawal does not apply to:
- goods made to measure or clearly personalized (e.g., cables cut to size, custom configurations);
- sealed goods that are not suitable for return for hygienic reasons or health protection, if unsealed after delivery;
- digital content supplied on a non-material medium, if the performance has begun with your prior consent and acceptance of the loss of the right of withdrawal.
Outlet Items: Items in the Outlet category are sold as final sale and are not returnable.
B2B Sales: The right of withdrawal does not apply to contracts concluded with customers holding a VAT number.
How to ship the return
Once the request has been submitted, send all items to: Oniroview, Via Piave 17, 95129 Catania (CT), Italy.
- Pack carefully and use secure, tracked shipping: products lost or damaged during return transit cannot be refunded.
- To protect the original packaging, place it in a second box when possible. Do not apply labels or adhesive tape directly to the product's original packaging.
Tax deductions and benefits for ordinary and extraordinary maintenance
To request tax breaks, send your request to the email address: amministrazione@oniroview.com
IRPEF deductions at 50%
You are entitled to a 50% deduction for the purchase of products connected to building interventions, such as electrical systems, video intercoms and alarm systems and LED lighting. It is not required to send any documents to our company. To take advantage of the deduction, simply indicate the total expense in your 730 or in the Unico form.
The documents to be kept are:
- Bank transfer receipt
- Purchase invoices showing the nature, quality and quantity of the goods purchased and, preferably, the buyer's tax code
Procedure to follow:
- Place an order on our site by selecting "Bank Transfer" as the payment method.
- Request the invoice and indicate the desired deduction in the order notes.
- Make the payment via bank transfer, compliant with the provisions of the Revenue Agency. The transfer must include:
- Reason for payment (include order number and date)
- Oniroview tax code and/or VAT number: 05660420877
- Tax code of the payer
In the absence of even one of the two fields indicated above, the order will be processed without invoicing.
10% reduced VAT for building renovations and conservative renovations ( 10% REDUCED VAT - 50% TAX DEDUCTION)
Purchase of goods, with the exclusion of raw materials and semi-finished products, used in conservative restoration and building renovation. Use for the purchase of LED lighting is permitted .
Requested documents:
-
Copy of Identity Card
-
Copy of valid tax code or health card
-
Copy of DIA or SCIA or CIL (or building permit) where the "Type of intervention" is indicated
-
Declaration for reduced VAT ( download the form here )
The documents indicated above must be sent to the email address amministrazione@oniroview.com , after completing the order. Once the documentation has been verified, we will issue an advance invoice with the reduced VAT to proceed with the payment.
Procedure to follow:
- Place an order on our site by selecting "Bank Transfer" as the payment method.
- Request the invoice and indicate in the order notes by writing "your tax code and advance invoice for renovation and restoration, VAT 10%" in the same 'Order note' field.
- Make the payment via bank transfer indicating the invoice number
In the absence of even one of the two fields indicated above, the order will be processed without invoicing.
VAT reduced at 4% for the construction of the first non-luxury home
The use of LED lighting for the purchase of non-luxury properties is permitted (the property must not have luxury characteristics, according to the criteria indicated in the decree of 2 August 1969).
Requested documents:
-
Copy of Identity Card
-
Copy of valid tax code or health card
-
Copy of DIA or SCIA or CIL (or building permit) where the "Type of intervention" is indicated
-
Declaration for reduced VAT ( download the form here )
The documents indicated above must be sent to the email address amministrazione@oniroview.com , after completing the order. Once the documentation has been verified, we will issue an advance invoice with the reduced VAT to proceed with the payment.
Procedure to follow:
- Place an order on our site by selecting "Bank Transfer" as the payment method.
- Request the invoice and indicate in the order notes by writing "your tax code and advance invoice for the facilitation of construction of a first home, VAT 4%" in the same field.
- Make the payment via bank transfer indicating the invoice number
In the absence of even one of the two fields indicated above, the order will be processed without invoicing.
Furniture Bonus
Purchase of Furniture and Appliances, including LED lighting for private individuals and condominiums. Legislative decree no. 63/2013 introduced a further 50% deduction for the purchase of furniture and large appliances and LED lighting, aimed at furnishing properties undergoing renovation.
The main prerequisite for obtaining the deduction is the carrying out of a recovery intervention on the building heritage (renovation, restoration, etc.).
It is not required to send any documents to our company. To take advantage of the deduction, simply indicate the total expense in your 730 or in the Unico form.
The documents to be kept are:
- Bank transfer receipt
- Purchase invoices showing the nature, quality and quantity of the goods purchased and, preferably, the buyer's tax code
Procedure to follow:
- Place an order on our site by selecting "Bank Transfer" as the payment method.
- Request the invoice and indicate in the order notes by writing "your tax code and "advance invoice for mobile bonuses" in the same field.
- Make the payment via bank transfer indicating the invoice number
In the absence of even one of the two fields indicated above, the order will be processed without invoicing.
VAT exemption with Reverse Charge and Split Payment
To take advantage of reverse charge and split payment on Oniroview.com, Public Administration suppliers and companies that perform services through procurement and subcontracting contracts must follow this procedure:
- Complete the order on our website by selecting "Bank transfer" as the payment method.
- Specify in the order notes that you have the necessary documentation for VAT-free payment.
- Send the documentation to facilitazioni@oniroview.com , including the order reference.
After verifying the documentation, we will issue an advance invoice with the reduced VAT to proceed with the payment.













